Webinar Recording
Title: Digitise and Monitor Local Network Substations for the Future With »EOR-3DS« & »PQSys«
Date: 2024-10-10
Description:
Thank you for your interest! In this video, we present solutions for the future-proof integration and monitoring of digital local network substations in times of growing challenges for the distribution network.
Content:
Part: Future-proof integration of digital local substations into the distribution grid (Gerald Jacob, Product Manager »EORSys«):
• Requirements for local substations in times of change in energy supply and staff shortages
• Remotely reported and remotely controlled local grid stations as the core of the smart grid of the future
• EOR-3DS as a digitalisation unit for ONS
• Application example from a large distribution grid operator
Part: Power quality and power outflow measurement in the local substation (Fabian Leppich, Product Manager »PQSys«):
• The path to transforming energy grids
• Importance of monitoring local substations
• PQ measurement directly at the local grid transformer in combination with current feeder measurement technology
• Three-stage concept for more transparency in the low-voltage grid – adapted to the challenges in the grids
• Application examples
Click Here to Watch the Webinar Recording: